The roof is the easy part of an internal floating roof tank. The deck and its seal are a defined deliverable, and the deck travels on the product and does not carry the tank load. What actually decides whether the installation works is everything around it: the columns that pass through the deck, the gauge wells, the drains, the ladder, the vent arrangement and the space above the deck. This article works through the tank-side consequences, because that is where the specification has to be right.
An internal floating roof adds a moving structure inside a tank that was designed around a static one. The deck travels vertically through the full operating range of the liquid level, and every fixed fitting in the tank is now something the deck has to pass, clear or seal against. The tank has not been structurally overloaded, but it has been functionally changed, and the changes are permanent.
The second reason the tank changes is the vapour space. Removing the large vapour space changes the pressure, vacuum and gas concentration conditions in the space above the deck, which changes the vent sizing, the relief requirements and the operating procedures. The Louisiana implementation plan for volatile organic compound storage is instructive on how much of this becomes a formal design condition: it requires that all tank gauging and sampling devices be gas tight except while gauging or sampling is taking place, that rim space vents and automatic bleeder vents be gasketed, that ladder wells be equipped with a sliding cover, and that each opening in the floating roof, other than rim space vents and automatic bleeder vents, be provided with a projection below the liquid surface.
Those requirements exist because a floating deck is a moving obstacle. Anything that penetrates it has to be sealed, and anything that penetrates it and cannot be sealed has to be kept under the product at the lowest operating level.
Penetration | Treatment on an internal floating roof | Why |
Support columns | Column sleeves with sealing; columns must be located so the deck can pass and the sleeve can be maintained | Columns are fixed and the deck moves relative to them, so a sleeve seal is required at every column |
Gauge well and stilling wells | Sealed sleeves or a gasketed cover on the deck; the well must be arranged so the deck clears it at all levels | Guage connections are a direct route from the product vapour space to the instrument |
Gauge pole and guide rails | Guide rails provide deck centring and rotation control; the gauge pole carries the level measurement and must be sealed at the deck | Without centring control the deck can rotate and ride unevenly against the seal |
Sample wells and sample lines | Submerged below the product at the lowest operating level, or sealed and gasketed where they cannot be | An open sample connection above the product is an uncontrolled vapour path |
Deck drains and sumps | Sealed drains with a manually or remotely operated valve, positioned so the deck can be fully drained for inspection | Liquid trapped under the deck prevents entry and can corrode the deck from beneath |
Ladder and manway arrangements | Sliding covers on ladder wells; the ladder itself must be checked for deck clearance through the level range | An open ladder well is a direct vapour path and an obstruction to the deck |
Mixers and their mounts | Mixer mounts must be sealed at the deck and must be positioned clear of the seal path | A rotating mixer mount moves relative to the deck and cannot be sealed the way a fixed column can |
Emergency and foam fittings | Positioned above the deck travel and coordinated with the deck's landing position | Foam and water systems have to work with the deck in the way |
This table is the working content of a tank-interface assessment. The pattern in it is that a penetration which is a simple hole in a fixed roof becomes an engineered detail on a floating roof. That is also why retrofitting an existing tank is not simply a matter of dropping a deck in and it is why the tank arrangement drawing is the single most important document a roof supplier needs. Without it, the supplier is guessing, and the guesses land on site as change orders.
Because the vapour space above the deck is now the dominant vapour space in the tank, the fixed roof above has to be re-evaluated rather than inherited. The EPA reference material notes that the space above an internal floating roof is vented, with circulation vents around the perimeter and often a centre vent, and that this vented space is what keeps the space above the deck near atmospheric rather than allowing a flammable vapour concentration to accumulate.
That means the vent arrangement cannot simply be copied from the tank's original design. The volume above the deck is smaller than the original headspace, and the load and the consequences of a vent that cannot pass the required flow are different. Where the tank has a pressure and vacuum relief device that was sized for the original headspace, its interaction with the new vapour space has to be reviewed, because the operating scenario for a floating roof tank can differ from a fixed roof tank in the way it draws or passes vacuum.
The heating and ventilation of the space above the deck also deserves a look, particularly where the tank sits in a climate with high ambient temperature, because that space is now smaller and its gas concentration behaviour changes accordingly.
Three levels govern an internal floating roof tank, and all three have to be stated in the enquiry. The maximum filling level, which determines how close the deck comes to the fixed roof and its fittings. The minimum operating level, which determines the minimum freeboard of the deck and therefore how much contamination, ice or rainwater the buoyancy has to tolerate. And the level at which the deck lands on its supports, which is the level at which the tank is emptied for inspection and the level at which the deck's own weight and the product's support are exchanged.
Landing is the operation that most often reveals a specification problem. When the deck lands, the product is no longer supporting it, and the deck must then be stable enough to support the weight of an inspector and to remain in position without floating unexpectedly when liquid is returned. A poorly specified landing arrangement produces a tank that cannot be inspected safely, and a tank that is inspected badly is a tank whose deck and seal condition is never actually known.
The level instrumentation arrangement is part of this and not an afterthought. The measurement needs to distinguish the product level, the deck level and the position of the deck when it is landed, because those are three different states with three different implications.
In a new build, the tank and the roof are designed together, so the column layout, the guide rail arrangement, the deck penetration positions and the vent philosophy can all be resolved on the drawing before anything is fabricated. That is the ideal case, and it is worth saying that some of the awkwardness in the retrofit case is a consequence of the tank having been built first, for a different purpose.
In a retrofit, the roof has to live with what exists. Every column, every gauge well, every existing nozzle and every drain becomes a constraint that has to be surveyed, and some of them will have to be modified or sealed. Component access becomes a hard constraint, because the whole assembly has to reach the tank through existing openings or through a purpose-made opening that itself requires hot work on a tank that may be carrying product.
There is a third case that is increasingly common and should be mentioned: adding an internal floating roof to a tank that already has one of a different type, or replacing a worn deck in a tank whose fixed roof and internal arrangement were designed for a deck. That is a much more constrained problem than a greenfield installation, and it needs a survey rather than a specification.
An internal floating roof has to be inspected, and the inspection has to happen with the tank drained and the deck landed. That imposes requirements on the deck design that are easy to overlook in a procurement specification. The deck must be drainable, so that the space beneath it can be emptied and entered. The pontoon compartments and any enclosed volumes must be arranged so that trapped vapour, internal corrosion and loss of integrity can be detected, because a compartment that cannot be inspected is a compartment whose failure is invisible until it matters.
Supplier product literature in this field makes the same point in slightly different words, noting that some designs incorporate closed compartments, pontoons, honeycombs or internal cavities where vapour, product or moisture can accumulate, and that where closed spaces exist, inspection becomes more difficult and risks associated with trapped vapour, internal corrosion, damaged floats or invisible loss of integrity arise. The recommendation that follows from that observation is that designs which reduce closed spaces and allow visual inspection should be preferred in demanding applications.
That is a requirement on the specification, not a preference on the drawing. The number, size and arrangement of enclosed volumes in the deck should be an explicit requirement in the enquiry, and the inspection regime should be written at the same time as the geometry.
Case evidence disclosure: the verified Centre Enamel project library contains no internal floating roof delivery, and the closest related records are aluminium dome roof deliveries on drinking water, municipal wastewater and seawater desalination tanks. Those records describe a roof that spans the tank from the shell ring, not a deck that floats on the product, so none of them evidences the tank-side behaviour described here. No project is cited, and no tank arrangement, penetration detail or commissioning outcome is claimed from any installation.
An internal floating roof does not load the tank, but it changes it comprehensively: every penetration becomes a sealed detail, the fixed roof above has to be re-vented for a different vapour space, the level envelope and the landing arrangement become part of the design, and the deck has to be inspectable through its enclosed volumes. That is why the tank arrangement drawing, not the roof data sheet, is the document that determines whether an installation works. Send us the arrangement drawing or a penetration schedule with the tank data and we will map the roof onto the tank and tell you where the conflicts are.
Q: Do the tank columns have to be modified to fit an internal floating roof?
A: They usually have to be sleeved and sealed rather than relocated, because the columns are structural and carry the fixed roof loads. What has to be confirmed is the column arrangement relative to the seal path, the column sleeve detail and its maintainability, and the clearance between the column and the moving deck through the full level range. Some installations do require columns to be modified or additional columns added, which is why the as-built arrangement drawing is required before any design work starts.
Q: What happens to the tank's vents when an internal floating roof is installed?
A: They have to be reviewed rather than inherited. The vapour space above the deck is now the dominant vapour space, and it is normally kept close to atmospheric by circulation and centre vents, with rim space vents to relieve excess pressure or vacuum. Existing vent and pressure-vacuum relief sizing was established for the original headspace, and the operating scenario for a floating roof tank differs from a fixed roof tank. Regulations commonly require rim space vents and automatic bleeder vents to be gasketed and require the openings in the floating roof to be sealed.
Q: Can the tank still be gauged and sampled with an internal floating roof?
A: Yes, and the arrangements have to be designed. Gauging and sampling devices are normally required to be gas tight except while gauging or sampling is taking place, and the openings through the deck into a gauge well or sample well have to be sealed and kept below the product at the lowest operating level. The level instrumentation has to distinguish product level, deck level and the landed position, since those are three different operating states.
Q: How is the roof landed and how is the tank inspected?
A: The deck floats on the product and lands on its supports when the tank is drained to the specified landing level. Once landed, the deck must be stable enough to support inspection activity, and the arrangement must prevent the deck floating unexpectedly when liquid is returned. For inspection, the space beneath the deck has to be drainable and enterable, and enclosed volumes within the deck have to be arranged so that trapped vapour and internal corrosion can be detected. The inspection regime should be written at the same time as the deck geometry, not after it.
Q: Is a retrofit onto an existing tank more expensive than specifying it on a new build?
A: Generally yes, and the reasons are predictable: the survey of existing penetrations and fittings, the modification or sealing of items that cannot be accommodated, the constraint that components must reach the tank through existing openings, and the possibility that an opening has to be cut in a tank that may still be carrying product. On a new build the tank and the roof are designed together, which removes most of those costs. If a retrofit is being considered, the survey should precede the commercial discussion.
Q: Does the tank shell need strengthening for an internal floating roof?
A: The roof deck does not carry the product load and its buoyancy is provided by the product itself, so the shell does not take a large additional static load. However, the operating loads on the deck are real: the deck moves through the level range, turbulence during filling and drawing imposes loads on it, and seismic conditions apply to the deck, the seal and the guide arrangement. Any guide rails, landing supports and column sleeves that are added to the tank do impose loads on the shell and the foundation, and those should be included in the structural assessment.
Center Enamel is the trading name of Shijiazhuang Zhengzhong Technology Co., Ltd, established in 2008 and based in Shijiazhuang, Hebei Province, China. The company manufactures glass-fused-to-steel bolted tanks, fusion-bonded epoxy coated tanks, stainless steel and welded steel tanks, pressure vessels, aluminium geodesic dome roofs and floating roof systems. Aluminium dome design work is carried out against AWWA D108, API 650, ADM 2015, ASCE 7-10 and IBC 2012, and the broader product range is covered by ISO 9001, NSF/ANSI 61, CE/EN 1090, ISO 28765, WRAS and FM approvals. The company reports 30,000 installed projects and an annual output of 300,000 enamel steel plates, with technical support delivered through an international distributor network and a stated 24-hour response commitment.
If your project involves tank roofs, floating decks or the shells that carry them, send the tank diameter, shell height, product, operating temperature and site design loads. We will return a preliminary structural concept, the applicable design code basis, and a written scope that separates what is included from what the site contractor must provide.