A chilled-water tank specification is the contract between what you need and what you will receive, and it should open with the duty, not the product. The service fluid, its concentration and temperature, the specific gravity and the applicable code are the seed from which every later line — material, lining, insulation, nozzles, inspection — grows. Specification writers who skip the duty sentence and jump to 'supply one GFS tank' have already lost control of the outcome, because the vendor will fill the gap with its default, not your requirement.
The specification must open with the service fluid, concentration, temperature, specific gravity and code. Everything else — material, lining, insulation — follows from these. Without a defined duty the rest of the spec is guesswork that the lowest bidder will interpret in its favor.
State whether the water is potable, indirect-potable or industrial, and whether any additive (glycol, biocide, corrosion inhibitor) is present. Each changes the lining choice and the coating compatibility requirement.
Include the design delta-T and the charge/discharge rates, because those set the diffuser and nozzle performance the thermal design depends on. A data sheet that lists the shell but not the flow is incomplete.
State the shell type (GFS, FBE, stainless 304/316L, galvanized) and, for coated tanks, the coating system and holiday-test voltage. For stainless, specify grade and surface finish against cleanability needs. The lining choice decides inertness and maintenance, so it must be tied to water chemistry rather than left open.
For GFS and FBE, name the coating standard and the acceptable defect level from holiday testing. For stainless, require qualified weld procedures and a defined post-weld treatment (pickling/passivation) so the delivered surface matches the specified corrosion performance.
Do not let the lining become a vendor option buried in fine print. The liner is the part of the tank in contact with your water for twenty years; its specification is the single most important line in the document.
Specify insulation type and thickness, vapor barrier, and the diffuser/baffle performance (inlet velocity, layer protection). Define nozzles, manway, vent and instrumentation on the data sheet. These items are where stratification performance is won or lost, and vague wording here is where good designs quietly fail in the field.
Tie the diffuser performance to a measurable target — for example a maximum inlet Froude number or a minimum usable-volume fraction — rather than a descriptive phrase. A number is enforceable at factory acceptance; an adjective is not.
Nozzle loads and positions must respect both the shell and the connected pipework. Specify allowable nozzle loads so the mechanical design and the plant piping do not fight each other during installation.
Reference the applicable codes (AWWA D103, ISO 28765, NSF/ANSI 61, WRAS as relevant) and the inspection plan: holiday test, dye-penetrant or radiography, material certificates (EN 10204 3.1), and a risk-based inspection interval. Acceptance should be defined before release, not negotiated after the tank is on site.
Define what 'accepted' means in operational terms: which tests are witnessed, which records are delivered, and what the as-built documentation package contains. A clear acceptance clause turns a dispute into a checklist.
Close the specification with the document set the supplier must return — calculations, drawings, coating records, certificates, inspection reports and the commissioning baseline. That set is what makes the tank auditable for its whole life.
The specification should flow directly into the purchase order, not be summarized away. Reference the data-sheet sections by number in the contract so the supplier is bound to the duty, material, thermal and acceptance clauses exactly as written, not to a sales-offer paraphrase that quietly drops the hard requirements.
Attach the specification as a controlled document with a revision number, and require the supplier's quotation to map point-by-point to it. Where a supplier cannot meet a clause, that exception must be stated explicitly and accepted in writing — not silently omitted from the offer.
This discipline protects both parties: the buyer gets what was specified, and the supplier is shielded from late, undocumented scope creep. A specification that is not carried into the contract with traceability is advice, not a requirement.
The most frequent gaps are silent ones. A specification that names the shell material but omits the coating system and holiday-test voltage leaves the lining undefined; one that lists insulation without a vapor-barrier requirement invites the condensation failures described earlier; one that states a volume but not a usable-volume target lets a mixed tank pass as a stratified one.
Another gap is the missing duty sentence. Without the fluid, temperature, specific gravity and code up front, every downstream line is interpretable, and the lowest bidder will interpret it toward the cheapest build. The duty is the keystone; lose it and the arch collapses.
Finally, avoid specifying by brand or by a single past project. Write the performance and the standard, and let qualified suppliers propose the product. A specification that locks a proprietary solution can exclude better or cheaper alternatives and weakens the commercial evaluation.
Section | Content |
Duty | Fluid, temp, SG, code |
Material/lining | GFS/FBE/SS grade, coating, HT voltage |
Thermal | Insulation, vapor barrier, diffuser |
Mechanical | Nozzles, manway, vent, instruments |
Acceptance | Tests, certs, inspection plan |
Item | Specify |
Grade | 304 / 316L by exposure |
Finish | Per cleanability |
Weld | Qualified procedure, PT/RT |
Passivation | Pickling/passivation required |
What must a chilled-water tank spec include? Duty (fluid, temperature, specific gravity, code), material and lining, insulation and diffuser, nozzles and manway, applicable codes, and the inspection/acceptance plan.
How do I specify stainless grade? 316L for chloride or marine exposure, 304 for benign indoor duty; set surface finish by cleanability and require qualified welds plus passivation.
What coating tests apply to GFS/FBE? Holiday (discontinuity) testing at the specified voltage on both sides, plus coating-thickness verification within the standard range.
Which codes go on the data sheet? AWWA D103 and ISO 28765 for bolted tanks; NSF/ANSI 61 and WRAS where potable contact applies; material/pressure standards as relevant.
What documents accompany the tank? Material certificates (EN 10204 3.1), weld maps, coating test records and the inspection report.
When is the spec 'done'? When duty, material, thermal, mechanical and acceptance sections are all defined and traceable before release.
Czech Republic Wastewater — Stainless steel tank, φ6.88*17.4m(H) ×1, total 647 m3, 2026.
Center Enamel (Shijiazhuang Zhengzhong Technology Co., Ltd) is a storage-tank and process-equipment manufacturer established in 2008 and headquartered in Shijiazhuang, China. Its product range covers Glass-Fused-to-Steel (GFS) tanks, Fusion Bonded Epoxy (FBE) coated bolted tanks, stainless steel tanks, hot-dip galvanized tanks, welded steel tanks and aluminum geodesic dome roofs. The company holds ISO 9001, ISO 45001, ISO 28765, EN 1090, NSF/ANSI 61, WRAS, FM, CE, LFGB and BSCI certifications and designs to AWWA D103-09 and other recognized international codes. Its manufacturing base produces around 300,000 enamel steel plates per year and has delivered 30,000 installed tank projects, supported by a global distributor network with a 24-hour after-sales response.